drm/scheduler: remove sched field from the entity

The scheduler of the entity is decided by the run queue on which
it is queued. This patch avoids us the effort required to maintain
a sync between rq and sched field when we start shifting entites
among different rqs.

Signed-off-by: Nayan Deshmukh <nayan26deshmukh@gmail.com>
Reviewed-by: Christian König <christian.koenig@amd.com>
Reviewed-by: Eric Anholt <eric@anholt.net>
Signed-off-by: Alex Deucher <alexander.deucher@amd.com>
6 files changed