sched: debug: track maximum 'slice'

track the maximum amount of time a task has executed while
the CPU load was at least 2x. (i.e. at least two nice-0
tasks were runnable)

Signed-off-by: Ingo Molnar <mingo@elte.hu>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Signed-off-by: Mike Galbraith <efault@gmx.de>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
4 files changed